Wiring Approved


The last several days have been spent drilling holes and pulling wire. It's amazing how much wire goes into a kitchen and a bathroom, especially when the bathroom will eventually contain laundry appliances. Today the electrical inspector came and inspected and approved the wiring. With that approved, I could proceed with the insulation and cover up my beautiful wiring job. I completed just about all the wall insulation, and the ceiling will follow shortly. Below are a few pictures of the current state of things. It is still technically outside the envelope of the house, since the original wall is still up and there is no heat yet, but we are moving closer to having the wall come down.